2020年6月13日 星期六
Leakage from gap of sheet piling
The water leakages are found during the excavation, particular one location is worse.
the immediate action has been taken to stop the soil out with the water leakage.
immediate action been taken
to stop the soil out with the water leakage
Temporary stair installation
as the excavation getting deeper, installing the temporary stairs for accessing to the excavation area.
Proceeding the 2nd stage excavation
The small excavator is scratching off the soil from the sheet piles, and the other excavators are busy on excavation.
2020年6月12日 星期五
The weather is good for excavation
The weather is good for excavation
excavation is ongoing
2020年6月11日 星期四
2nd Stage of excavation
The excavation proceeds by 2-3 excavators, and one at excavation surface.
2020年6月10日 星期三
dig dig dig
2020年6月9日 星期二
Start the 2nd phase excavation
Start the 2nd phase excavation
2020年6月8日 星期一
Complete the horizontal supporting steels installation
Complete the horizontal supporting steels installation
較新的文章
較舊的文章
首頁
訂閱:
意見 (Atom)
Finally 正式啟用
為曾經參與的每一個人喝采
#164 設施管路採用明管 - 並不是良藥
在建造階段, 因為預埋管路來不及做整合及出設計圖, 因此有個原則說, 變電站首重功能, 可以採用明管. 不過, 明管的設計與整合, 似乎就不被重視了. 因此出現牆面上佈滿各式管路, 還幾乎排不下 - 重疊,跨越,... 甚至, 遮蔽了燈具或更改電盤位置或管路路徑
#163 家具 VS 設計
設計圖上沒有家具的細節 負責採購的EPCM公司也沒有進行採購 - 因為不知道要怎樣的規格 那麼, 該由誰出面來推動這項工作呢? 首先, 需要先確認要交付的內容 - 這部分應該由總管設計的協調人, 或是專案經理來確定方向, 指派專人與業主確定交付的內容, 再將家具公司的訊息併入設計...
Finally 正式啟用
為曾經參與的每一個人喝采