2020年6月1日 星期一

Start the extra "well points" for de-watering

As the underground water level does not drop down to the expected level, the drilling machine back to site for adding extra well points inside of the excavation area. 


沒有留言:

張貼留言

Finally 正式啟用

 為曾經參與的每一個人喝采